Module overview
Section 6 of 6 · Open sections

Required section · Section 6 of 6

What holds up, and what your facility fills in

Use engineering and work-practice controls before PPE. For a specific task, the current Exposure Control Plan and the ensemble in use govern the PPE selection and donning/doffing sequence.

Knowledge checks

Reading and checks are open. Sign in only to save.

Knowledge check 1

For a splash-prone bench task, what should determine the PPE ensemble and donning/doffing sequence?

Choose one option.

Section status

Finish this section

Reading and checks are open. Sign in only to save.

The module finishes after every required section is marked done and every check in those sections is correct.