Required section · Section 6 of 6
What the plan supports, what stays local
Use the plan as a local operating decision: define its acceptance criteria, controls, review triggers, and owner from the laboratory evidence for this test system.
Before adopting or continuing an IQCP, confirm current jurisdiction and accreditor applicability. A changed procedure, accreditation requirement, or local evidence can require revision.
An IQCP places controls where local evidence says a failure can reach a patient result; it does not authorize fewer controls by itself.
Knowledge checks
Reading and checks are open. Sign in only to save.
Knowledge check 1
Section status
Finish this section
Reading and checks are open. Sign in only to save.
The module finishes after every required section is marked done and every check in those sections is correct.